Charlotte Water is requesting bids for construction of the Franklin Water Treatment Plant Clearwell project. This project includes installation of large diameter (72 to 120 inch) pipes, valves, and fittings. It also includes constructing a new chemical feed system, including a new building, pumps, storage silos, and chemical piping.
Requirements
Last Updated: 06/21/23
Insurance Requirements+
Automobile-For automobile operations liability
Constructions Bonds-For bidding, payment, completion of construction projects
General Liability-For bodily injury or property damage, arising from products, premises, completed work, personal & advertising injury
Workers Compensation-For lost wages and medical expenses of injured workers
Bonding Requirements+
Bid Bond-City required Bond to ensure that vendors do not retract bids from the time they submit a bit until the contract has been executed.
Payment Bond-City required Bond to ensure that subcontractors and/or suppliers are paid for any work performed.
Performance Bond-City required Bond to ensure satisfactory completion of a project by the vendor.
Subcontracting Opportunities+
Subcontracting Opportunities
Pipe, Tubing, Accessories, Not Fittings; Pipe and Tubing Fittings; Construction, General: Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.; Demolition Services; Construction, Construction, Sidewalk and Driveway, Including Pedestrian and Handicap Ramps; Paving and Resurfacing, Alley and Parking Lot; Concrete; Electrical; Heating, Ventilating and Air Conditioning (HVAC); Masonry; Plumbing; Networking Services, Including Installation, Security, and Maintenance; Hauling Services; Erosion Control Services
Estimated Total Value+
$10,000,000+
Utilization+
SBE-Small Business Enterprise
MBE-Minority Business Enterprise
Contract Term+
Not to Exceed
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!