Department of General Services / Construction
Firehouse # 46 Infill Station at Miranda Road
Details
A new infill firehouse will be designed and constructed at 4032 Miranda Road to alleviate high call volumes and meet response time standards in the area. The firehouse will reflect the design of Firehouse #45, a 3-bay, 2-story firehouse programmed for approximately 14,600 square feet. The proposed facility will be located at the corner of Beatties Ford Road. Parcel #03741123 is approximately 6.54 acres. This location and site selection meets the City of Charlotte Policy for Sustainable City Facilities and Charlotte Fire Department Facilities Master Plan.
Wharton-Smith has been awarded CMAR services and is working on prequalifying subcontractors for the project.
Posting Number 04 2025-Q2(Apr-Jun)-DGS-14397
Anticipated Posting Date 2025-04-01
Commodity Code(s): 91200, 91219, 91244, 91319, 91345, 91347, 91356, 91394, 91430, 91438, 91450, 91455, 91468, 91473, 98814, 98852
A new infill firehouse will be designed and constructed at 4032 Miranda Road to alleviate high call volumes and meet response time standards in the area. The firehouse will reflect the design of Firehouse #45, a 3-bay, 2-story firehouse programmed for approximately 14,600 square feet. The proposed facility will be located at the corner of Beatties Ford Road. Parcel #03741123 is approximately 6.54 acres. This location and site selection meets the City of Charlotte Policy for Sustainable City Facilities and Charlotte Fire Department Facilities Master Plan.
Wharton-Smith has been awarded CMAR services and is working on prequalifying subcontractors for the project.
Requirements
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!