Aviation / Construction
The Fixed Based Operator (FBO) Apron Expansion & Rehab project will construct additional aircraft parking area on the FBO apron, construct a new taxilane entrance stub to the FBO ramp, widen the existing entrance stub to support Airplane Design Group (ADG) V movements, and rehabilitate select pavements areas on the FBO ramp for Taxiway Design Group (TDG)-V aircraft. The apron expansion will remove an existing trailer office and auto parking space by converting the area to aircraft pavement that will adjoin the Bank of America apron area. The project scope will include building and parking area demolition, security fencing, asphalt and concrete pavement, airfield electrical, and airfield pavement markings.
Posting Number 10 2025-Q4(Oct-Dec)-AVI-20098
Anticipated Posting Date 2025-10-13
Commodity Code(s): 90910, 90911, 91310, 92975
The Fixed Based Operator (FBO) Apron Expansion & Rehab project will construct additional aircraft parking area on the FBO apron, construct a new taxilane entrance stub to the FBO ramp, widen the existing entrance stub to support Airplane Design Group (ADG) V movements, and rehabilitate select pavements areas on the FBO ramp for Taxiway Design Group (TDG)-V aircraft. The apron expansion will remove an existing trailer office and auto parking space by converting the area to aircraft pavement that will adjoin the Bank of America apron area. The project scope will include building and parking area demolition, security fencing, asphalt and concrete pavement, airfield electrical, and airfield pavement markings.
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!