Charlotte Storm Water Services / Construction
The project involves analysis of existing conditions to determine portions of the storm drainage system needing improvement, and design and construction of needed improvements. The existing storm system experienced a pipe collapse due to poor condition of the pipe. To address the request and meet level of service design standards the project will remove and replace the existing Storm Drainage Infrastructure within the project scope.
Proposed improvements include removing approximately 343 LF of 18″ storm water pipe and replace with approximately 410 LF of 24″ storm water pipe, add 2 double catch basins and associated items, and remove and replace approximately 357 LF of 8″ sewer pipe, and 3 sewer manholes.
Posting Number 06 2027-Q2(Apr-Jun)-CSWS-20352
Anticipated Posting Date 2027-06-15
Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915
The project involves analysis of existing conditions to determine portions of the storm drainage system needing improvement, and design and construction of needed improvements. The existing storm system experienced a pipe collapse due to poor condition of the pipe. To address the request and meet level of service design standards the project will remove and replace the existing Storm Drainage Infrastructure within the project scope.
Proposed improvements include removing approximately 343 LF of 18″ storm water pipe and replace with approximately 410 LF of 24″ storm water pipe, add 2 double catch basins and associated items, and remove and replace approximately 357 LF of 8″ sewer pipe, and 3 sewer manholes.