charlotte-water-bluet  Charlotte Water / Construction

Environmental Services Facility HVAC Boiler Replacements

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2025-06-04 2025-06-04 Environmental Services Facility HVAC Boiler Replacements

Replace three (3) HVAC boilers at Environmental Services Facility. Current units are at end-of-life. Minimum specs are: natural gas-fed at 150CFH; input 1,500,000 BTU/HR; output 1,400,000 BTU/HR; forced-draft burner on 120V/single-phase power; support communication protocols for LON, BACnet, and IoT. In addition to materials provision, awarded vendor shall perform the following tasks: verify all pipe, conduit, and wiring spec in field prior to proposal; remove and dispose of existing units; disconnect and reconnect hot water lines; disconnect and reconnect all electrical wiring; disconnect and reconnect controls; assess and add/modify any unit drainage systems; run new stainless double wall flue pipes to exterior and terminate at roof; perform combustion analysis to assure proper operation; insulate all piping; perform startup and operation check after install; and any other tasks necessary to ensure optimal operation upon completion.

Posting Number 06 2025-Q2(Apr-Jun)-CW-17423

Anticipated Posting Date 2025-06-04

Commodity Code(s): 03167

Replace three (3) HVAC boilers at Environmental Services Facility. Current units are at end-of-life. Minimum specs are: natural gas-fed at 150CFH; input 1,500,000 BTU/HR; output 1,400,000 BTU/HR; forced-draft burner on 120V/single-phase power; support communication protocols for LON, BACnet, and IoT. In addition to materials provision, awarded vendor shall perform the following tasks: verify all pipe, conduit, and wiring spec in field prior to proposal; remove and dispose of existing units; disconnect and reconnect hot water lines; disconnect and reconnect all electrical wiring; disconnect and reconnect controls; assess and add/modify any unit drainage systems; run new stainless double wall flue pipes to exterior and terminate at roof; perform combustion analysis to assure proper operation; insulate all piping; perform startup and operation check after install; and any other tasks necessary to ensure optimal operation upon completion.

Requirements

Last Updated: 03/06/25
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Laura Osborne

City Contact

Laura.Osborne@charlottenc.gov