Charlotte Storm Water Services / Construction
This project consists of two culverts in series under Cedarbrook Drive and Denbur Drive. Both culvert crossings consist of triple barrel corrugated metal pipe systems. This is a project that was identified by the asset management team and both culvert crossings are actively failing, and preliminary calculations show that the culverts are also undersized.
Posting Number 10 2025-Q4(Oct-Dec)-CSWS-5447
Anticipated Posting Date 2025-10-29
Commodity Code(s): 74505, 91200, 91244, 91345, 91430, 92912, 92915, 96884, 98814
This project consists of two culverts in series under Cedarbrook Drive and Denbur Drive. Both culvert crossings consist of triple barrel corrugated metal pipe systems. This is a project that was identified by the asset management team and both culvert crossings are actively failing, and preliminary calculations show that the culverts are also undersized.
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!