Eastway Storm Drainage Improvement Project

Details

Print Download
Add to Calendar 2026-03-15 2026-03-15 Eastway Storm Drainage Improvement Project

The project involves analysis of existing conditions to determine areas suitable for improvement, planning analysis of improvement alternatives, and the design and construction of the needed improvements in the Eastway Storm Drainage Improvement Project (SDIP) area.

The Eastway Storm Drainage Improvement Project is bordered by Arnold Drive to the north, Central Avenue to the south, Temple Lane to the east and Eastway Drive to the west.  This project area is within a drainage area of approximately 200 acres and the improvements may include pipe system upgrades and channel improvements.

Posting Number 03 2026-Q1(Jan-Mar)-CSWS-17293

Anticipated Posting Date 2026-03-15

Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915

The project involves analysis of existing conditions to determine areas suitable for improvement, planning analysis of improvement alternatives, and the design and construction of the needed improvements in the Eastway Storm Drainage Improvement Project (SDIP) area.

The Eastway Storm Drainage Improvement Project is bordered by Arnold Drive to the north, Central Avenue to the south, Temple Lane to the east and Eastway Drive to the west.  This project area is within a drainage area of approximately 200 acres and the improvements may include pipe system upgrades and channel improvements.

Requirements

Last Updated: 11/22/25
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Facebook Logo X Logo

For Questions, Contact:

Jaime Thompson

City Contact

Jaime.Thompson@charlottenc.gov