Aviation / Construction
East Airfield Lighting Vault HVAC System
Details
This project includes the replacement of the existing cooling only HVAC system in the East Airfield Lighting Vault with the following:
– Purchase and installation of two (2) redundant 20-ton computer room air conditioning (CRAC) split systems
– Installation of one (1) Airport-furnished ductless split system heat pump for the control room
– Installation of one (1) Airport-furnished ductless cooling only split system for the IT closet
– Purchase and installation of one (1) 208V/3Ø subpanel and associated 45kVA transformer
Posting Number 2024-Q4(Oct-Dec)-AVI-15758
Anticipated Posting Date 2024-11-05
Commodity Code(s): 91450
This project includes the replacement of the existing cooling only HVAC system in the East Airfield Lighting Vault with the following:
– Purchase and installation of two (2) redundant 20-ton computer room air conditioning (CRAC) split systems
– Installation of one (1) Airport-furnished ductless split system heat pump for the control room
– Installation of one (1) Airport-furnished ductless cooling only split system for the IT closet
– Purchase and installation of one (1) 208V/3Ø subpanel and associated 45kVA transformer
Requirements
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!
Tweets by EarlyBirdCLT