Charlotte Storm Water Services / Construction
Dry Detention Water Quality Enhancement Project
Details
This project includes constructing forebays to increase pretreatment of solids and create sheet flow through the basin, removing and replacing of existing turf grass in the bottom of the basins with a hardier herbaceous vegetative mix that provides more treatment, and modification of outlet structures of basins that increase retention time within the basins to increase pollutant removal.
Posting Number 12 2024-Q4(Oct-Dec)-CSWS-15863
Anticipated Posting Date 2024-12-17
Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915
This project includes constructing forebays to increase pretreatment of solids and create sheet flow through the basin, removing and replacing of existing turf grass in the bottom of the basins with a hardier herbaceous vegetative mix that provides more treatment, and modification of outlet structures of basins that increase retention time within the basins to increase pollutant removal.
Requirements
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!