aviation-bluet  Aviation / Construction

Concourse E – Phase 10

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2025-02-25 2025-02-25 Concourse E – Phase 10

Add a small addition onto concourse E of approximately 4,350-7,150sf for offices.  Base bid will be a 4,350sf addition with 2ea add alternates to add a 1,400sf bay/ea alternate for a potential maximum of 7,150sf.  This area to be shell space, divided into 2 separate tenant spaces.  Divider wall will be designed and installed to separate the two separate tenant spaces.  Location of proposed addition is on the west side of concourse E between the employee turnstile and aircraft envelope E4.

Posting Number 02 2025-Q1(Jan-Mar)-AVI-16195

Anticipated Posting Date 2025-02-25

Commodity Code(s): 906, 90910

Add a small addition onto concourse E of approximately 4,350-7,150sf for offices.  Base bid will be a 4,350sf addition with 2ea add alternates to add a 1,400sf bay/ea alternate for a potential maximum of 7,150sf.  This area to be shell space, divided into 2 separate tenant spaces.  Divider wall will be designed and installed to separate the two separate tenant spaces.  Location of proposed addition is on the west side of concourse E between the employee turnstile and aircraft envelope E4.

Requirements

Last Updated: 10/17/24
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Monique Scott

City Contact

monique.scott@cltairport.com