aviation-bluet  Aviation / Construction

Concourse E Moving Walkways

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon

Posting Number 02 2024-Q1(Jan-Mar)-AVI-14094

Anticipated Posting Date 2024-02-29

Commodity Code(s): 90910, 90934

Solicitation Link: https://www.charlottenc.gov/Growth-and-Development/Doing-Business/Contract-Opportunities/Concourse-E-Moving-Walkways

This project is to install three pair of new moving walkways on Concourse E at Charlotte Douglas International Airport (“CLT”). The Contractor shall provide new conveying systems that will work with the existing pit conditions and configurations, noting that one pair will be shortened by approximately 30’ to improve passenger circulation. Removal and disposal of the moving walkways, temporary infill of the of the existing pits, and pit modifications required to the first pair of moving walkways (E-MW-01/E-MW-02) are part of the separate Concourse E Renovations project (currently underway) and thus are not part of this scope of work. As such, it is imperative that the Contractor closely coordinate with the Concourse E Renovations project through the CLT project manager.

Requirements

Last Updated: 03/25/24
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background