Aviation / Architectural / Engineering Services
Concourse D/E Connector Renovations (Design)
Details
Posting Number 07 2022-Q3(Jul-Sep)-AVI-8759
Anticipated Posting Date 2022-07-14
Commodity Code(s): 90600, 90735
Solicitation Link: https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1983
Repositioning the major passenger circulation route of the D/E connector between the Atrium to the end of the moving walkways at the approach of Concourse D. Relocating the airline lounge space from the departure level to an upper-level location while expanding it to 40,000 square feet. Providing a new passenger destination and experience at the departures level that will provide increased financial returns to the airport. Providing a service area at the apron level to help with operations within the DECO area.
Requirements
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!