The Collective Storm Drainage Improvement Project (SDIP) Series J contains three separate projects which vary in size and each bring their unique differences. The work involves various storm drainage improvements including replacement of storm drainage pipes, culvert, masonry drainage structures, water line, sewer line, asphalt pavement, concrete driveways, concrete sidewalk and concrete curb. These improvements will realign storm drainage to reduce structure flooding and address failing infrastructure. Due to the complexity of these projects and their proximity to utility poles/structures/retaining walls, active shoring will be required.
Requirements
Last Updated: 05/22/22
Insurance Requirements+
Automobile-For automobile operations liability
Constructions Bonds-For bidding, payment, completion of construction projects
General Liability-For bodily injury or property damage, arising from products, premises, completed work, personal & advertising injury
Workers Compensation-For lost wages and medical expenses of injured workers
Bonding Requirements+
Bid Bond-City required Bond to ensure that vendors do not retract bids from the time they submit a bit until the contract has been executed.
Payment Bond-City required Bond to ensure that subcontractors and/or suppliers are paid for any work performed.
Performance Bond-City required Bond to ensure satisfactory completion of a project by the vendor.
Subcontracting Opportunities+
Subcontracting Opportunities
Pipe and Tubing; Construction, Curb and Gutter (Includes Maintenance, Repair, and Removal); Construction, Sewer and Storm Drain; Construction, Sidewalk and Driveway (Includes Pedestrian and Handicap Ramps); Construction, Water System, Main and Service Line; Paving/Resurfacing, Street (Major and Residential); Concrete; Hauling Services; Utility Locator Service (Underground); Pavement Marking Services, Including Removal of Markings; Traffic Control Services (To Include Placement and Removal of Control Devices); Erosion Control Services; Landscaping, Including Design, Fertilizing, Planting, etc. Not Grounds Maintenance or Tree Trimming Services
Estimated Total Value+
$1,000,000 -4,999,999
Utilization+
SBE-Small Business Enterprise
MBE-Minority Business Enterprise
6% MBE and 15% SBE
Contract Term+
Through Project Completion