charlotte-storm-water-services-bluet  Charlotte Storm Water Services / Construction

Collective M (Sharon Hills)

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2025-01-15 2025-01-15 Collective M (Sharon Hills)

The need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is a collective package of 7 small Storm Drain Improvement projects that will be constructed under one contract.  This project package is under review and location and project details will be provided after review is complete.

Posting Number 01 2025-Q1(Jan-Mar)-CSWS-7054

Anticipated Posting Date 2025-01-15

Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915

The need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is a collective package of 7 small Storm Drain Improvement projects that will be constructed under one contract.  This project package is under review and location and project details will be provided after review is complete.

Requirements

Last Updated: 08/21/24
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Jaime Thompson

City Contact

Jaime.Thompson@charlottenc.gov