charlotte-storm-water-services-bluet  Charlotte Storm Water Services / Construction

Collective AF Storm Drainage Improvement Project:

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2024-11-27 2024-11-27 Collective AF Storm Drainage Improvement Project:

Collective Storm Drainage Improvement Projects Series AF will involve 3 projects throughout the City of Charlotte 6112 Bridlewood Ln, 6108 Bridlewood Ln, 6032 Bridlewood Ln. 6112 Bridlewood Ln will consist of lining approx. 149 LF 15” RCP; 243 LF 30” RCP; 151 LF 36” RCP with CIPP. Scope also includes replacing rerouting the existing system into the r/w and adding approx. 177 42” RCP and 122 LF of 34×53 elliptical pipe and storm drainage structure replacement. There will also be approx. 418 LF of sewer replacement with 8” DIP. Pavement resurfacing and curb and gutter replacement are also to be included in this project. 6108 Bridlewood Ln will consist of removing an existing CMP pipe and replacing with approx. 31 LF of 9×7 RCBC. A temporary pedestrian bridge will be added to cross the creek during time of construction for the property owners. The scope is also to include approx. 31LF of 15” RCP replacement along with replacement of (1) CB, concrete driveway replacement, curb and gutter and pavement resurfacing. There will also be grading around the existing creek that will tie into (2) new HWs. 6032 Bridlewood Ln will consist of removing an existing CMP pipe and replacing with approx. 30 LF of 9×7 RCBC. A temporary pedestrian bridge will be added to cross the creek during time of construction for the property owners. The scope is also to include concrete driveway replacement, curb and gutter, and pavement resurfacing. There will also be grading around the existing creek that will tie into (2) new HWs.                

Posting Number 11 2024-Q4(Oct-Dec)-CSWS-12654

Anticipated Posting Date 2024-11-27

Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915

Collective Storm Drainage Improvement Projects Series AF will involve 3 projects throughout the City of Charlotte 6112 Bridlewood Ln, 6108 Bridlewood Ln, 6032 Bridlewood Ln. 6112 Bridlewood Ln will consist of lining approx. 149 LF 15” RCP; 243 LF 30” RCP; 151 LF 36” RCP with CIPP. Scope also includes replacing rerouting the existing system into the r/w and adding approx. 177 42” RCP and 122 LF of 34×53 elliptical pipe and storm drainage structure replacement. There will also be approx. 418 LF of sewer replacement with 8” DIP. Pavement resurfacing and curb and gutter replacement are also to be included in this project. 6108 Bridlewood Ln will consist of removing an existing CMP pipe and replacing with approx. 31 LF of 9×7 RCBC. A temporary pedestrian bridge will be added to cross the creek during time of construction for the property owners. The scope is also to include approx. 31LF of 15” RCP replacement along with replacement of (1) CB, concrete driveway replacement, curb and gutter and pavement resurfacing. There will also be grading around the existing creek that will tie into (2) new HWs. 6032 Bridlewood Ln will consist of removing an existing CMP pipe and replacing with approx. 30 LF of 9×7 RCBC. A temporary pedestrian bridge will be added to cross the creek during time of construction for the property owners. The scope is also to include concrete driveway replacement, curb and gutter, and pavement resurfacing. There will also be grading around the existing creek that will tie into (2) new HWs.                

Requirements

Last Updated: 10/28/24
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Ian Thompson

Procurement Officer

ian.thompson@charlottenc.gov