CEP Chiller 5 Expansion

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2025-01-15 2025-01-15 CEP Chiller 5 Expansion

The scope of this project is to connect one 2000-ton chiller (owner furnished and set on equipment pad) and corresponding mechanical equipment to the CEP. The addition of the chiller will also include the installation of one 2000-ton rooftop cooling tower, one chilled water pump, removal of existing filtration systems, new side filtration skids, and one condenser water pump. Existing structure and piping will be extended as needed to accommodate the installation of the listed equipment.

Posting Number 01 2025-Q1(Jan-Mar)-AVI-16092

Anticipated Posting Date 2025-01-15

Commodity Code(s): 92830, 96246

The scope of this project is to connect one 2000-ton chiller (owner furnished and set on equipment pad) and corresponding mechanical equipment to the CEP. The addition of the chiller will also include the installation of one 2000-ton rooftop cooling tower, one chilled water pump, removal of existing filtration systems, new side filtration skids, and one condenser water pump. Existing structure and piping will be extended as needed to accommodate the installation of the listed equipment.

Requirements

Last Updated: 10/08/24
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Monique Scott

City Contact

monique.scott@cltairport.com