Department of General Services / Construction
Project limits are from just south of Evergreen Cemetery Dr to about 400’ south of Central Ave at Kilborne Dr on Norland Rd (0.43 miles). The project includes a shared-use path on one side of the street, storm drainage, water line work, and 2 Rectangular Rapid Flashing Beacons (RRFBs).
Posting Number 06 2025-Q2(Apr-Jun)-DGS-8945
Anticipated Posting Date 2025-06-27
Commodity Code(s): 55078, 74505, 91200, 91219, 91223, 91240, 91244, 91319, 91345, 91347, 91430, 91455, 96185, 96239, 96861, 96884, 98814
Project limits are from just south of Evergreen Cemetery Dr to about 400’ south of Central Ave at Kilborne Dr on Norland Rd (0.43 miles). The project includes a shared-use path on one side of the street, storm drainage, water line work, and 2 Rectangular Rapid Flashing Beacons (RRFBs).