Charlotte Storm Water Services / Construction
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is located near the intersection of Camp Greene Street and Freedom Drive.
Posting Number 11 2025-Q4(Oct-Dec)-CSWS-8369
Anticipated Posting Date 2025-11-02
Commodity Code(s): 74505, 91200, 91244, 91345, 91430, 92912, 92915, 96884, 98814
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is located near the intersection of Camp Greene Street and Freedom Drive.
Get updates on this opportunity by following the hashtag on Twitter or Facebook!