Earlybird, Business Opportunity Pipeline, City of Charlotte

charlotte-storm-water-services-bluet  Charlotte Storm Water Services / Construction

Brooklain-Coulwood Storm Drainage Improvement Project

Details

Print Download
Add to Calendar 2027-03-05 2027-03-05 Brooklain-Coulwood Storm Drainage Improvement Project

The Brooklain-Coulwood Storm Drainage Improvement Project is bordered by Cathey Road to the east, Brooklain Drive to the south, Waycross Drive to the west, and Coulwood Drive to the north.  This construction project involves addressing flooding concerns and structurally deficient City pipe system at a total of 4 culverts.  An analysis of existing conditions was performed to determine portions of the storm drainage system needing improvement as well as planning analysis of improvement alternatives.  Design phase efforts will be performed as well as construction of needed improvements.

Posting Number 03 2027-Q1(Jan-Mar)-CSWS-20579

Anticipated Posting Date 2027-03-05

Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915

The Brooklain-Coulwood Storm Drainage Improvement Project is bordered by Cathey Road to the east, Brooklain Drive to the south, Waycross Drive to the west, and Coulwood Drive to the north.  This construction project involves addressing flooding concerns and structurally deficient City pipe system at a total of 4 culverts.  An analysis of existing conditions was performed to determine portions of the storm drainage system needing improvement as well as planning analysis of improvement alternatives.  Design phase efforts will be performed as well as construction of needed improvements.

Requirements

Last Updated: 03/05/26
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Facebook Logo X Logo

For Questions, Contact:

Colleen Tully

City Contact

Colleen.Tully@charlottenc.gov