charlotte-department-transportation-bluet  Charlotte Department of Transportation / General Services

Bridge Repair Design

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2026-10-05 2026-10-05 Bridge Repair Design

The Consultant shall prepare technical plans and specifications for the required repairs to the City’s bridges per the Inspection Reports. The Consultant shall schedule completion dates for each bridge. Before the beginning of the next inspection cycle, all bridge repairs should be completed by the contractor.

The Consultant shall prepare two (2) bid documents (including one for guardrail work).  Each shall include the technical plans and specifications for the bid packages for each bridge, as well as bid information/requirements for potential contractors.

Posting Number 10 2026-Q4(Oct-Dec)-CDT-13550

Anticipated Posting Date 2026-10-05

Commodity Code(s): 91842, 91896, 92536, 96847

The Consultant shall prepare technical plans and specifications for the required repairs to the City’s bridges per the Inspection Reports. The Consultant shall schedule completion dates for each bridge. Before the beginning of the next inspection cycle, all bridge repairs should be completed by the contractor.

The Consultant shall prepare two (2) bid documents (including one for guardrail work).  Each shall include the technical plans and specifications for the bid packages for each bridge, as well as bid information/requirements for potential contractors.

Requirements

Last Updated: 01/14/25
Insurance Requirements+
Bonding Requirements+
Subcontracting Opportunities+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Donna Mash

City Contact

donna.mash@charlottenc.gov