Charlotte Department of Transportation / General Services
Bridge Repair Design
Details
The Consultant shall prepare technical plans and specifications for the required repairs to the City’s bridges per the Inspection Reports. The Consultant shall schedule completion dates for each bridge. Before the beginning of the next inspection cycle, all bridge repairs should be completed by the contractor.
The Consultant shall prepare two (2) bid documents (including one for guardrail work). Each shall include the technical plans and specifications for the bid packages for each bridge, as well as bid information/requirements for potential contractors.
Posting Number 10 2026-Q4(Oct-Dec)-CDT-13550
Anticipated Posting Date 2026-10-05
Commodity Code(s): 91842, 91896, 92536, 96847
The Consultant shall prepare technical plans and specifications for the required repairs to the City’s bridges per the Inspection Reports. The Consultant shall schedule completion dates for each bridge. Before the beginning of the next inspection cycle, all bridge repairs should be completed by the contractor.
The Consultant shall prepare two (2) bid documents (including one for guardrail work). Each shall include the technical plans and specifications for the bid packages for each bridge, as well as bid information/requirements for potential contractors.
Requirements
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!