Aviation / Construction
The project involves a new baggage transfer line that will replace an existing transfer line in the main CLT Airport baggage area. The predominant work associated with the project includes an addition to the baggage handling system, along with minor amounts of electrical, drywall, and ceiling work. The duration of the project is directly related to the manufacture of baggage handling components, which could result in an overall project duration between six months and eighteen months. Much of the work will be required to be performed at night, in coordination with the main baggage handling area and baggage handling system schedules.
Posting Number 04 2026-Q2(Apr-Jun)-AVI-20112
Anticipated Posting Date 2026-04-01
Commodity Code(s): 03526, 90910, 90911
The project involves a new baggage transfer line that will replace an existing transfer line in the main CLT Airport baggage area. The predominant work associated with the project includes an addition to the baggage handling system, along with minor amounts of electrical, drywall, and ceiling work. The duration of the project is directly related to the manufacture of baggage handling components, which could result in an overall project duration between six months and eighteen months. Much of the work will be required to be performed at night, in coordination with the main baggage handling area and baggage handling system schedules.
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!