As part of the airfield master plan effort to repair runway and taxiway asphalt shoulders asphalt crack seal and replacement is needed to meet Part-139 FAA requirements. This project will re-construct and repair asphalt shoulders for Runway 18R/36L, Runway 18C/36C, Taxiway’s Echo, Whiskey, and Charlie.
The project includes erosion and sedimentation control, airfield asphalt paving and repair which meet FAA circular requirements.
Posting Number 04 2025-Q2(Apr-Jun)-AVI-13449
Anticipated Posting Date 2025-04-30
Commodity Code(s): 74502, 91364, 92914
As part of the airfield master plan effort to repair runway and taxiway asphalt shoulders asphalt crack seal and replacement is needed to meet Part-139 FAA requirements. This project will re-construct and repair asphalt shoulders for Runway 18R/36L, Runway 18C/36C, Taxiway’s Echo, Whiskey, and Charlie.
The project includes erosion and sedimentation control, airfield asphalt paving and repair which meet FAA circular requirements.