Asphalt Shoulder Rehabilitation-Phase II

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2025-04-30 2025-04-30 Asphalt Shoulder Rehabilitation-Phase II

As part of the airfield master plan effort to repair runway and taxiway asphalt shoulders asphalt crack seal and replacement is needed to meet Part-139 FAA requirements. This project will re-construct and repair asphalt shoulders for Runway 18R/36L, Runway 18C/36C, Taxiway’s Echo, Whiskey, and Charlie.
The project includes erosion and sedimentation control, airfield asphalt paving and repair which meet FAA circular requirements.

Posting Number 04 2025-Q2(Apr-Jun)-AVI-13449

Anticipated Posting Date 2025-04-30

Commodity Code(s): 74502, 91364, 92914

As part of the airfield master plan effort to repair runway and taxiway asphalt shoulders asphalt crack seal and replacement is needed to meet Part-139 FAA requirements. This project will re-construct and repair asphalt shoulders for Runway 18R/36L, Runway 18C/36C, Taxiway’s Echo, Whiskey, and Charlie.
The project includes erosion and sedimentation control, airfield asphalt paving and repair which meet FAA circular requirements.

Requirements

Last Updated: 08/14/24
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Ryan Lingholm

Procurement Officer

Ryan.Lingholm@ci.charlotte.nc.us