charlotte-water-bluet  Charlotte Water / Construction

Ashe Plantation Phase II Upgrades – Re-Advertisement for Bids

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2024-10-03 2024-10-03 Ashe Plantation Phase II Upgrades – Re-Advertisement for Bids

The Project consists of the demolition of the existing 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration, clarifiers), filters, generator, shed and select yard piping. The new infrastructure includes a new 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration), two
clarifiers, pre-engineered office/lab building, generator and the associated yard piping, site work, electrical and instrumentation. This scope of work also includes the relocation of and existing 8” gravity sewer line.

Posting Number 10 2024-Q4(Oct-Dec)-CW-4792

Anticipated Posting Date 2024-10-03

Commodity Code(s): 91071, 91200, 91244, 91319, 91345, 91396, 92500, 96239, 96884, 98157, 98814

Solicitation Link: https://charlottenc.bonfirehub.com/opportunities/156388

The Project consists of the demolition of the existing 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration, clarifiers), filters, generator, shed and select yard piping. The new infrastructure includes a new 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration), two
clarifiers, pre-engineered office/lab building, generator and the associated yard piping, site work, electrical and instrumentation. This scope of work also includes the relocation of and existing 8” gravity sewer line.

Requirements

Last Updated: 11/05/24
Insurance Requirements+
Bonding Requirements+
Subcontracting Opportunities+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Jessica Hunt

Procurement Officer

7047792193

jessica.hunt@charlottenc.gov