Earlybird, Business Opportunity Pipeline, City of Charlotte

charlotte-storm-water-services-bluet  Charlotte Storm Water Services / Construction

Arbor Pointe Dr 3201 Storm Drainage Improvement Project

Details

Print Download
Add to Calendar 2027-01-04 2027-01-04 Arbor Pointe Dr 3201 Storm Drainage Improvement Project

Asset Management performed an inspection of the dual 60-inch CMP culverts with paved inverts beneath Arbor Glen Ln in June 2023. Proposing CIPP lining on the dual 60″ CMP culverts. Replacing the two headwalls. There are improvements on the side system of the culverts. Remove and replace a catch basin along with 15″ RCP. Remove and replace a single catch basin with a double catch basin. Remove and replace a section of 24″ RCP.

Posting Number 01 2027-Q1(Jan-Mar)-CSWS-20577

Anticipated Posting Date 2027-01-04

Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915

Asset Management performed an inspection of the dual 60-inch CMP culverts with paved inverts beneath Arbor Glen Ln in June 2023. Proposing CIPP lining on the dual 60″ CMP culverts. Replacing the two headwalls. There are improvements on the side system of the culverts. Remove and replace a catch basin along with 15″ RCP. Remove and replace a single catch basin with a double catch basin. Remove and replace a section of 24″ RCP.

Requirements

Last Updated: 03/05/26
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Facebook Logo X Logo

For Questions, Contact:

Colleen Tully

City Contact

Colleen.Tully@charlottenc.gov