aviation-bluet  Aviation / Construction

Airport Roof Replacement and Repairs

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon

Posting Number 03 2021-Q1(Jan-Mar)-AVI-4630

Anticipated Posting Date 2021-03-20

Commodity Code(s): 14560, 77000, 91066, 91473

Solicitation Link: https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1628

Charlotte Douglas International Airport (CDIA) has responsibility for maintenance and repair of approximately one hundred (100) buildings including the airport terminal. CDIA requires a minimum of two on-call contractors to perform repairs, replacement and emergency roof repairs of these facilities.

The selected contractors will enter into a time and materials contract for on-call roof replacement and repair services on an as needed basis. The contract will include a three (3) base years and two (2) optional one-year (I) terms for a total potential contract period of five (5) years. The work shall include the furnishing of all supervision, labor, materials, and services required to make the necessary repairs. Along with making repairs to roofs, the contractors shall be required to demolish and remove existing roof materials and dispose of all waste material.  Repairs shall be billed on an agreed upon hourly rate and percent mark-up on materials.

Requirements

Last Updated: 03/16/21
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background