7th Street Parallel Bike Routes (Revised 2/2026)

Details

Print Download
Add to Calendar 2026-11-06 2026-11-06 7th Street Parallel Bike Routes (Revised 2/2026)

This project will build bike facilities in several different locations throughout the Elizabeth neighborhood to create safer conditions and improve ease of travel for cyclists and pedestrians, including approximately 2.1 miles of sharrows, modernization of two existing rectangular rapid flashing beacons, replacement of 10 wheelchair ramps, a new pedestrian crossing at Pecan Avenue and Shenandoah Avenue, implementation of new bike detection cameras, a new full traffic signal at Bascom Street and 7th Street, and a curb extension located at the intersection of Pecan Avenue and 8th Street.

February 2026 Update: This project’s scope has been divided into 2 phases and will not go out for public bid; the City plans to use an established on-call contract for both phases because construction of traffic signals is required.

Posting Number 11 2026-Q4(Oct-Dec)-DGS-14170

Anticipated Posting Date 2026-11-06

Commodity Code(s): 55078, 80183, 90976, 91200, 91223, 91240, 91319, 91347, 91361, 91396, 96861, 96882, 96884

This project will build bike facilities in several different locations throughout the Elizabeth neighborhood to create safer conditions and improve ease of travel for cyclists and pedestrians, including approximately 2.1 miles of sharrows, modernization of two existing rectangular rapid flashing beacons, replacement of 10 wheelchair ramps, a new pedestrian crossing at Pecan Avenue and Shenandoah Avenue, implementation of new bike detection cameras, a new full traffic signal at Bascom Street and 7th Street, and a curb extension located at the intersection of Pecan Avenue and 8th Street.

February 2026 Update: This project’s scope has been divided into 2 phases and will not go out for public bid; the City plans to use an established on-call contract for both phases because construction of traffic signals is required.

Requirements

Last Updated: 02/24/26
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Facebook Logo X Logo

For Questions, Contact:

Mackenzie Winebrenner

City Contact

980.214.7291

Mackenzie.winebrenner@charlottenc.gov