This project consists of 400 LF of existing 24” RCP along 6th St, from N Church St to N Popular St, will be rehabilitated through pipe bursting methods. Two work pits will be excavated, one at the corner of 6th & N Church St, and the other at 6th & N Popular St. The project will require road closures at 6th & N Church St and 6th & N Popular St, and 1 lane closure along 6th street. A new stormwater junction box will be installed at the corner of 6th street and N Popular St.

 

Posting Number 2024-Q1(Jan-Mar)-CSWS-9830

Anticipated Posting Date 2024-03-30

Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915

This project consists of 400 LF of existing 24” RCP along 6th St, from N Church St to N Popular St, will be rehabilitated through pipe bursting methods. Two work pits will be excavated, one at the corner of 6th & N Church St, and the other at 6th & N Popular St. The project will require road closures at 6th & N Church St and 6th & N Popular St, and 1 lane closure along 6th street. A new stormwater junction box will be installed at the corner of 6th street and N Popular St.

 

Requirements

Last Updated: 02/28/24
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background

For Questions, Contact:

Jaime Thompson

City Contact

Jaime.Thompson@charlottenc.gov