6th and Church Pipe Repair

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2024-03-30 2024-03-30 6th and Church Pipe Repair

This project consists of 400 LF of existing 24” RCP along 6th St, from N Church St to N Popular St, will be rehabilitated through pipe bursting methods. Two work pits will be excavated, one at the corner of 6th & N Church St, and the other at 6th & N Popular St. The project will require road closures at 6th & N Church St and 6th & N Popular St, and 1 lane closure along 6th street. A new stormwater junction box will be installed at the corner of 6th street and N Popular St.

 

Posting Number 03 2024-Q1(Jan-Mar)-CSWS-9830

Anticipated Posting Date 2024-03-30

Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915

This project consists of 400 LF of existing 24” RCP along 6th St, from N Church St to N Popular St, will be rehabilitated through pipe bursting methods. Two work pits will be excavated, one at the corner of 6th & N Church St, and the other at 6th & N Popular St. The project will require road closures at 6th & N Church St and 6th & N Popular St, and 1 lane closure along 6th street. A new stormwater junction box will be installed at the corner of 6th street and N Popular St.

 

Requirements

Last Updated: 02/28/24
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Jaime Thompson

City Contact

Jaime.Thompson@charlottenc.gov