As part of the Fourth Parallel Runway Program at CLT, this construction package will include the new West Parallel Taxiway and its connector taxiways.  The project includes erosion and sedimentation control, grading, drainage, airfield concrete and asphalt paving, fencing marking, and airfield lighting/signage.

To support CLT’s Fourth Parallel Runway Program, this project will also include the installation of Navigational Aids (NAVAIDs) for the new Fourth Parallel Runway. To support the new Runway 1C-19C, the project requires construction of glide slope, localizer, approach lighting systems, and all associated support structures, access roads, and infrastructure.  The general scope of this bid package includes demolition, erosion and sedimentation control, grading, drainage, airfield electrical, vehicle service roads, and utilities.

Posting Number 03 2025-Q1(Jan-Mar)-AVI-12922

Anticipated Posting Date 2025-03-17

Commodity Code(s): 91223, 91240, 91395, 91618, 92528, 98814, Aspha

As part of the Fourth Parallel Runway Program at CLT, this construction package will include the new West Parallel Taxiway and its connector taxiways.  The project includes erosion and sedimentation control, grading, drainage, airfield concrete and asphalt paving, fencing marking, and airfield lighting/signage.

To support CLT’s Fourth Parallel Runway Program, this project will also include the installation of Navigational Aids (NAVAIDs) for the new Fourth Parallel Runway. To support the new Runway 1C-19C, the project requires construction of glide slope, localizer, approach lighting systems, and all associated support structures, access roads, and infrastructure.  The general scope of this bid package includes demolition, erosion and sedimentation control, grading, drainage, airfield electrical, vehicle service roads, and utilities.

Requirements

Last Updated: 07/19/24
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Gregory Tate

City Contact

gregory.tate@cltairport.gov