charlotte-storm-water-services-bluet  Charlotte Storm Water Services / Construction

2500 Briargrove Dr.

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2026-04-01 2026-04-01 2500 Briargrove Dr.

This project involves installing a closed drainage system down both Briargrove Dr. and Milton Rd. to reroute runoff from an existing stream. The proposed closed drainage system ties back into the existing culvert under Colby Pl.

Posting Number 04 2026-Q2(Apr-Jun)-CSWS-19039

Anticipated Posting Date 2026-04-01

Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915

This project involves installing a closed drainage system down both Briargrove Dr. and Milton Rd. to reroute runoff from an existing stream. The proposed closed drainage system ties back into the existing culvert under Colby Pl.

Requirements

Last Updated: 10/02/25
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Colleen Tully

City Contact

Colleen.Tully@charlottenc.gov