Glassy Creek/Brentwood/Parkwood Stream Restoration

This stream restoration construction project provides for the upgrading of lakes and ponds, dam repairs, and other improvements to reduce the level of pollution in stormwater.   The need for the project is based on the maintenance of facilities such as lakes and ponds that enhance stormwater quality under the requirements of the Clean Water Act.

Crestmont Drive (4724) Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after the review is complete.

Flintridge Dr (2831) Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

6th and Graham Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Edgewater/Rosecrest Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Dobson Dr (832) Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Shamrock Gardens Storm Drainage Improvement Project

This construction project is located near Eastway Drive and Shamrock Drive and involves addressing a deteriorated corrugated metal pipe system located within the Shamrock Gardens Apartment complex as well as flooding of multiple roadway crossings. An analysis of existing conditions will be performed to determine portions of the storm drainage system needing improvement, planning analysis of improvement alternatives, design and construction of needed improvements. The Shamrock Gardens Storm Drainage Improvement Project is bordered by Purser Drive to the north, Shamrock Drive to the south, Briar Creek to the east and Eastway Drive to the west.

Pebblestone Storm Drainage Improvement Project

Pebblestone Storm Drainage Improvement Project consist of channel stabilization and a parking lot rebuilt. The improvements will include approximately 250 linear feet of bank hard stabilization and 170 linear feet of bank soft stabilization. In addition to the channel stabilization, sanitary sewer improvements are required. 180 linear feet of 10-inch and 32 linear feet of 16-inch ductile iron restrained joint sanitary sewer pipe. 180 linear feet of 16-inch and 20 linear feet of 24-inch steel encasement pipe.

Cancelled- Thorncliff Drive (7316) Storm Drainage Improvement Project

The purpose and need for the construction project are to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after the review is complete.