Water and Wastewater Roofing Replacement Packages 12 charlotte-water

Charlotte Water / Construction

Water and Wastewater Roofing Replacement Packages 12

Roofing Replacement of various Water Treatment Plants and Lift Stations. The Project consists of replacing roofing systems at Sharon Repump Station, Hoskins Booster Pump Station, and Plaza Booster Pump Station, as well as removing existing skylight and install clerestory and roof structure at Plaza Booster Pump Station and replacing the skylight at Idlewild Booster Pump …

McDowell Roofs Package 3 – Cancelled charlotte-water

Charlotte Water / Construction

McDowell Roofs Package 3 – Cancelled

This project consists of replacing various roofs at the McDowell Creek Wastewater Treatment Plant.  This package will potentially include the replacement of four separate roofs.

Airport Roof Replacement and Repairs aviation

Aviation / Construction

Airport Roof Replacement and Repairs

Charlotte Douglas International Airport (CDIA) has responsibility for maintenance and repair of approximately one hundred (100) buildings including the airport terminal. CDIA requires a minimum of two on-call contractors to perform repairs, replacement and emergency roof repairs of these facilities. The selected contractors will enter into a time and materials contract for on-call roof replacement …

Citywide Roof Inspection and Maintenance engineering-property-management

Department of General Services / General Services

Citywide Roof Inspection and Maintenance

The purpose of this project is to provide specified inspection schedules, and also for on-call, as needed services for unscheduled inspection services, minor roof maintenance, and repairs. Work is to include inspections of gutters, scuppers, down spouts, coping caps, expansion joint covers, and gravel stop joints and flashings. In addition, building perimeter inspections will be …

Vest Water Treatment Plant Clearwell No. 3 Roof Replacement charlotte-water

Charlotte Water / Construction

Vest Water Treatment Plant Clearwell No. 3 Roof Replacement

The Vest WTP’s Clearwell No. 3 existing precast concrete panels which already had its  existing TPO Membrane roof demolished will be replaced  with a new FRP Deck and TPO Membrane roof.

Roofing Replacement (W2R2) – Construction Package 8 Catawba River Pump Station; Roofing Replacement (W2R2) – Construction Package 9 Franklin Water Treatment Plant (WTP) charlotte-water

Charlotte Water / Construction

Roofing Replacement (W2R2) – Construction Package 8 Catawba River Pump Station; Roofing Replacement (W2R2) – Construction Package 9 Franklin Water Treatment Plant (WTP)

The Project consists of roofing replacement for Package 8 – Catawba River Pump station Generator Building and Package – 9 the Franklin Water Treatment Plant Aluminum Feed Building, Maintenance Building, Raw Water Pump Station, and High Service Pump Station #2.

CMPD Northwest Division Police Station (Re-Bid) engineering-property-management

Department of General Services / Construction

CMPD Northwest Division Police Station (Re-Bid)

The Project is the Charlotte Mecklenburg Police Department’s Northwest Division The building site is located at 1800 & 1818 Mt Holly-Huntersville Rd., Charlotte, NC 28214. The Project consists of a new 16,000 square foot, single story facility. The scope includes, but is not limited to, the following: a. Improvements to Mt Holly-Huntersville Road b. New …