Opportunities per Page
Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.
From Date
To Date
Opportunities per Page
Department of General Services / General Services
Vehicle Accessories and Up-fitting
City Wide, Department of General Services / General Services
General Vehicle Collision Repair Services
The City requires qualified service providers to work in conjunction with the City’s Fleet Management staff to perform complete turnkey collision repairs and related services on city fleet and Mecklenburg County vehicles. Collision repairs may include but are not limited to paint and body work, frame, cooling systems, engine components, transmission, steering, and related part repairs or replacement.
Aviation, Department of General Services / General Services
Vehicle and Equipment Welding and Related Services
The City requires a company to work in conjunction with Fleet Management, the Airport and other city departments to provide Vehicle and Equipment Welding and Related Services to the City of Charlotte. The Company shall perform vehicle or equipment maintenance, repair, and modification through the provision of Vehicle and Equipment Welding and Related services for vehicles and equipment owned, operated, or maintained by the City.
Charlotte Storm Water Services / Construction
Collective AH (6633 Brookfield Place, 524 Wilby Drive)
524 Wilby Drive: The culvert will be constructed with a headwall and endwall, with the junction box In between. The 24” plastic pipe will be replaced with 24” RCP.
6633 Brookfield Place: 30” RCP from JB 9 to DCB 8 to be replaced with a 36” RCP , and curb to be added along Alexander Road and standard catch basins to be constructed along the curb.
Charlotte Storm Water Services / Construction
Pella Rd 6212 Project
Project consist of joint repairs and the lining of 563 LF of 66 CMP with CIPP. Three non-standard and three standard structures will be removed/replaced as well as two headwalls. 57 LF of 24 inch RCP will be removed and replaced. A rip rap apron will be revised/installed. 70 LF of an 8″ water main will also be relocated.
Charlotte Storm Water Services / Construction
Faulconbridge Rd 5749 Project
Project consists of lining 556 LF of 42 inch CMP and 131 LF of 15 inch RCP with CIPP. Eight existing drainage structures will be removed and replaced and two additional structures will be added. 221 LF of 15″ RCP will be removed and replaced. Chemical grouting joint repair will also be installed at approx. 15 locations throughout the 42″ CMP.
Charlotte Storm Water Services / Construction
Queens Storm Drainage Improvement Project
The project involves analysis of existing conditions to determine areas suitable for improvement, planning analysis of improvement alternatives, and the design and construction of the needed improvements in the Queens Storm Drainage Improvement Project (SDIP) area.
The Queens Storm Drainage Improvement Project is bordered by East 4th Street to the north, Baxter Street to the south, Caswell Road to the east and Baldwin Avenue to the west. This project area is within a drainage area of approximately 40 acres and the improvements will include pipe system upgrades and channel improvements.
Charlotte Storm Water Services / Construction
Eastway Storm Drainage Improvement Project
The project involves analysis of existing conditions to determine areas suitable for improvement, planning analysis of improvement alternatives, and the design and construction of the needed improvements in the Eastway Storm Drainage Improvement Project (SDIP) area.
The Eastway Storm Drainage Improvement Project is bordered by Arnold Drive to the north, Central Avenue to the south, Temple Lane to the east and Eastway Drive to the west. This project area is within a drainage area of approximately 200 acres and the improvements may include pipe system upgrades and channel improvements.
Charlotte Storm Water Services / Construction
Zone 3 Stomwater and Site Improvements
This construction will improve site conditions at the Zone 3 Field Operation facility. Construction work will include stormwater settling basins, stormwater conveyance, and various site improvements. The design is already complete.
Charlotte Area Transit System / Commodities & Goods
CATS Mobile Town Hall Vehicle Upfit
This vehicle upfit will serve as a mobile town hall for community events and will be available for use by all city departments. CATS will have first priority given the role CATS has served in bringing this mobile town hall to life.
PSR # 1729
Charlotte Department of Transportation / General Services
Snow and Ice Removal
The City of Charlotte Department of Transportation (CDOT) is responsible for the removal of snow and ice on City maintained streets. Additional resources are needed to clear streets during extraordinary winter weather events. Contractors provide additional dump truck and plowing equipment with licensed operators to supplement City services.
Department of General Services / Construction
Miranda Road Firehouse 46
A new infill firehouse will be designed and constructed at 4032 Miranda Road to alleviate high call volumes and meet response time standards in the area. The firehouse will reflect the design of Firehouse #45, a 3-bay, 2-story firehouse programmed for approximately 14,600 square feet. The proposed facility will be located at the corner of Beatties Ford Road. Parcel #03741123 is approximately 6.54 acres. This location and site selection meets the City of Charlotte Policy for Sustainable City Facilities and Charlotte Fire Department Facilities Master Plan.
The City of Charlotte requires qualified light vehicle dealers and general service providers to work in conjunction with the Fleet Management Division to support the city’s various up-fitting needs including but not limited to window tenting, bed liner installing, lift gates, and truck bed shells.