Opportunities per Page
The Department of General Services employs almost 500 people and is among the most diverse departments in the City of Charlotte. The department delivers a broad set of services to residents and municipal agencies, aiming to build a better community for everyone in Charlotte.
General Services includes Engineering & Project Management and Asset Management, alongside the Office of Sustainability & Resilience, City Procurement, and Charlotte Business INClusion. This department oversees a range of city services, such as managing city cemeteries, tree management, and real estate services. It also provides fleet management and landscape management, ensuring the maintenance of public facilities and capital infrastructure.
Businesses can engage with General Services through various procurement opportunities, including government RFPs, city contracts for bids, and other current bid opportunities. Partner with us to deliver essential services and contribute to the well-being and development of the Charlotte community through efficient and visionary leadership.
Opportunities per Page
Department of General Services / Construction
Harrisburg Road Shared Use Path (SUP) – Winterwood to Sam Dee
Department of General Services / Construction
Harrisburg Road Shared Use Path (SUP) – Ponderosa Pine to Colwic ... Harrisburg Road Shared Use Path (SUP) – Ponderosa Pine to Colwick Hill
Improvements on Harrisburg Road between Ponderosa Pine Lane and Colwick Hill Road, including a pedestrian hybrid beacon in between Denbur Drive and Cedarbrook Drive to create a more pedestrian-oriented corridor. Improvements will primarily include shared use path, sidewalk, drainage, mid-block pedestrian crossing, curb and gutter, and milling and overlay of asphalt.
Department of General Services / Construction
Harrisburg Road Shared Use Path (SUP) – Robinson Church Rd to Ti ... Harrisburg Road Shared Use Path (SUP) – Robinson Church Rd to Timbertop Ln
Improvements on Harrisburg Rd starting near Robinson Church Road and extending to Timbertop Lane to create a more pedestrian-oriented corridor. Improvements will primarily include shared use path, drainage, curb and gutter, and milling and overlay of asphalt.
Department of General Services / Construction
McCullough Drive Extension
An extension of McCullough Drive, from it’s current terminus east
of southeast of North Tryon Street, to the disconnected terminus
southwest of W.T. Harris Blvd. It is already designed and real
estate acquired. This is necessary for splitting this project apart
from the McCullough Streetscape Project. Length = 0.272 miles
Department of General Services / Architectural / Engineering Services, Construction
Bryant Farms Phase 2 (Design-Build)
This purpose of the Bryant Farms Road Extension, Phase II project is to continue the street connection of Bryant Farms Road between Rea Road and Ardrey Kell Road. The design is anticipated to include a two-lane road with turn lanes, shared-use path on both sides of the road, and improvements at the intersections of Bryant Farms Road with Rea Road, Tom Short Road, and Ardrey Kell Road. The project will also build a crossing over Flat Branch stream and will run adjacent to the Flat Branch Nature Preserve for a portion of the project.
Department of General Services / Architectural / Engineering Services
Professional Engineering Services for Transportation Projects – ... Professional Engineering Services for Transportation Projects – Complete – Please Archive
The Engineering Services Division of the Department of General Services (GS) is soliciting Statements of Qualifications (SOQ) from qualified engineering companies (Company) to provide the following three main components for this solicitation and interested parties may choose to be considered for any or all:
• Embedded Consultant Project Management staff: Primary responsibilities include reviewing project deliverables and the overall project management duties as normally performed by city Project Managers. The consultant must certify designs as a North Carolina Professional Engineer or defer this to the project engineer. QA/QC staff should have experience in designing and preparing construction plans for transportation projects and will oversee the work of Project Engineers and/or consultant designers on assigned projects and be directly responsible for ensuring projects are delivered on-schedule and within the allocated budget.
• Embedded Project Engineer staff: Primarily responsible for completing designs for an average of 4-10 projects per year, depending on size and scope. They will be the engineer of record for designs of varying sizes and will report directly to city or consultant Project Management Staff.
• Miscellaneous Planning and Design Services: The City of Charlotte is seeking assistance from qualified Transportation Consulting firms to provide transportation planning and transportation engineering on “on-call” basis. The on-call contract will provide a flexible and effective way for the city to respond to recurring consultant service needs covering a range of multi-dimensional transportation engineering and planning tasks. The flexible on-call consultant service contracts with qualified transportation firms will help meet the needs of the city. Each firm selected for an on-call contract will be required to enter into a master agreement with the city. This master agreement will fulfill the consultant solicitation and selection process for the work to be performed under the on-call contract.
Department of General Services / Construction
CMGC – ADA Ph 2 – CMaR – Contractor Pre-Qualificatio ... CMGC – ADA Ph 2 – CMaR – Contractor Pre-Qualification
Char-Meck Gov’t Center is identified in the City-wide ADA Transition Plan for Program Implementation. Project scope includes removing physical barriers identified in the ADA Transition Plan in conformance with code as applicable. Project Delivery for Phase 2 is Construction Manager at Risk (CMaR). Vendors will be encouraged to look for contractor pre-qualification notices from our CMaR, JE Dunn Construction Company in 2026. Scope includes Plaza Deck, 1st Floor Lobby, Mezz Level, Highrise and the adjacent parking deck.
Charlotte Fire Department, Department of General Services / Construction
CFD – Fire House 22 – Equity Improvements – Addition ... CFD – Fire House 22 – Equity Improvements – Addition and Renovations
An addition and equity renovation to existing fire station 22. The addition includes an expanded kitchen, fitness room, restroom, and other ancillary spaces. Renovated areas include the dormitory, the apparatus bay along with ADA improvements throughout the building and site.
Department of General Services / General Services
Vehicle Glass Repair and Replacement Services
The City requires a qualified vendor to provide Glass Replacement and Repair services on vehicles and equipment maintained by the City. The Company shall perform repair, replacement, maintenance, diagnostic, warranty repair and representation, and related Services on the City’s fleet of various light, medium, and heavy equipment owned and operated by the City at their Company facilities or at approved City locations.
Department of General Services / Construction
North Tryon St Left Turn Lane at University City Blvd
The purpose of this project is to improve traffic flow on North Tryon Street by extending the left turn lane. This project will include lane widening, drainage and pavement markings.
Department of General Services / Construction
Monroe Road Streetscape
Improvements on Monroe Road between North Wendover Road and Eaton Road to create a more pedestrian-oriented corridor and install a pedestrian hybrid beacon in front of Time Out Youth Center. Improvements will primarily include shared-use paths, drainage, and midblock pedestrian crossings.
Department of General Services / Construction
Cross Charlotte Trail (XCLT)− Matheson to Craighead (REVISED 7/2025) ... Cross Charlotte Trail (XCLT)− Matheson to Craighead (REVISED 7/2025)
The Matheson to Craighead segment of the Cross Charlotte Trail will implement a 14-foot shared use path beginning at E 36th Street. The path will continue down Cullman Ave and board walk up into a pedestrian bridge spanning the Norfolk Southern Railroad tracks utilizing a prefabricated structure within railroad right of way. The structure will then connect to the existing trail built by Brand Properties within the Kaleido Noda apartment complex.
July 2025 Update: This project will not go out for public bid; it is now being designed and constructed through a reimbursement agreement with a private developer.
Improvements on Harrisburg Road between Winterwood Place and Sam Dee Road to create a more pedestrian-oriented corridor. Improvements will primarily include shared use path, drainage, curb and gutter, and milling and overlay of asphalt.