Opportunities per Page
With Charlotte as the destination of a major international airport, it takes many people and skills to keep things running smoothly for passengers. Aviation contracts are available for maintenance mechanics, plumbers, carpenters, HVAC technicians, engineers, budget analysts, project managers, and more.
Charlotte Douglas International Airport is a major employment center, with more than 20,000 workers on site. The majority are employed by American Airlines, with nearly 10,000 additional workers employed by other airlines, tenants, contractors, and businesses, or government contracts. The CLT Douglas is a major contributor to the region’s economy with the Destination CLT capital development program underway, including various expansion projects to accommodate current and future passenger growth, providing RFP and contract opportunities for many. Explore aviation requests for proposals below.
Opportunities per Page
Aviation / General Services
Executive Recruitment Services
Aviation / Technology Goods & Services
CLT Technology Public Wi-Fi
This Contract is to provide a Public WiFi solution addressing the full spectrum of CLT’s technology systems. The Work will include, without limitation, program/project management, organizational change management, and implementation services covering the complete lifecycle of technology systems from inception, starting with planning, through design, procurement, configuration, integration, install, test, operational-readiness-activation-training (ORAT), and operation & maintenance (O&M), and replacement. This Public Wifi effort will cover all areas where existing coverage is present and to include any newly constructed areas.
Aviation / Construction
CLT Center Roadway Improvements
This project will construct a new exit lane leaving CLT Express Deck-Self Park, enhance signage along CLT Center Drive, and implement enhanced safety measures along this road. Work involved with this is project is a new asphalt roadway connection, additional wayfinding signage and pavement markings, and high visibility crosswalks with flashing beacons. Anticipated construction duration is 9 months. Project constraints will include some but not all night work depending on the work area.
Aviation / Construction
Asphalt Shoulder Rehabilitation-Phase II
As part of the airfield master plan effort to repair runway and taxiway asphalt shoulders asphalt crack seal and replacement is needed to meet Part-139 FAA requirements. This project will re-construct and repair asphalt shoulders for Runway 18R/36L, Runway 18C/36C, Taxiway’s Echo, Whiskey, and Charlie.
The project includes erosion and sedimentation control, airfield asphalt paving and repair which meet FAA circular requirements.
Aviation / Technology Goods & Services
On Call Technology Services
Contract(s) will be used to provide maintenance and support for systems purchased under these Contracts. The goal of the Technology On-Call IT Contract is to support all airport management services leveraging technology systems as needed including but not limited to parking, baggage, gate management, commerce, connectivity, wayfinding, security, ticketing, etc. Services may be applied to any type of airport system. The figure below encompasses the systems and services requested with a more detailed explanation provided in the Services section below. Contracts may include additional software licenses, services, and hardware. These task order Contracts will provide Aviation the necessary flexibility to ensure the needs of the rapidly changing environment are met. It is critical to ensure the Airport’s technology systems are stable and safe to allow tenants to connect to their own technology systems.
Aviation / Construction
Fixed-Based Operations North Basin Retrofit
The FBO North Basin Retrofit project will be for the purpose of retrofitting an existing dry stormwater detention basin situated along Airport Drive. Work under this project will include relocating a section of Security Identification Display Area (SIDA) fence, constructing a new riser system, repairing the outfall pipe beneath Airport Drive, and completing some minor grading within the basin itself. This work is expected to have a duration of approximately 60 days. Due to security fence relocation, the contractor may be required to obtain a SIDA badge.
Aviation / General Services
Building Management Systems
CLT is seeking proposals from qualified and experienced companies interested in maintaining existing or providing a Building Management Systems to monitor access control, cameras, HVAC and fire detection at the main Terminal, old Terminal building and at the CLT
Center.
Aviation / Construction
Concourse E – Phase 10
This project consists of a single-story addition to concourse E just south of aircraft envelope E4 and adjacent to the employee turnstile. The addition is primarily a shell space to be leased to a tenant or stakeholder for the final buildout. The base bid is for a 4,350 Square Feet (SF) addition and associated site work with two add alternates to increase the total SF by an additional 1,400 SF per alternate. Scopes of work that are included in this project but not limited to are: selective demolition, concrete SOG, structural steel, metal decking, miscellaneous steel fabrications, rough carpentry, PVC roofing and sheet metal, insulated core metal wall panels, waterproofing, joint sealants, HM doors and frames, door hardware, glazing, non-structural framing, gypsum board, acoustical panel ceilings, sheet carpeting, resilient base and accessories, painting, pre-engineered interior wall panel systems, resinous terrazzo flooring, signage, wall protective coverings, corner guards, fire protection specialties, plumbing, HVAC, electrical, fire sprinkler & telecommunications.
Aviation / Architectural / Engineering Services
Program Advisory and PMIS Support Services
This scope of work outlines the program management, advisory services, design management, project controls, project management information system (PMIS) and work & asset management (WAM) implementation and management services to support Charlotte Douglas International Airport (CLT) in the planning, executing, and monitoring of capital improvement projects, ensuring efficient delivery within budget and compliance with strategic goals and regulatory requirements.
Aviation / Construction
Concourse A Modifications
This Project aims to modify and relocate existing equipment, replace tables, add an experiential element, and extend tenant services at the Charlotte Douglas International Airport. The modifications of the existing equipment will accommodate a dual-use system at each Gate Counter including the electrical and data infrastructure leading up to the network. There will be a Flight Information Display System” that will need to be relocated in the connecting corridor which includes structural attachments to the building and repairs to the existing Terrazzo. Work hours between 2300 – 0500 EST to prevent disruption to Airport Operations. This project will require 100% badging for all workers.
Aviation / Commodities & Goods
Locks and Accessories
CLT is seeking bids to provide locks, hardware, and accessories.
Aviation / General Services
Flooring Services
Charlotte Douglas International Airport is seeking a firm to provide flooring services that may include but not limited to demolition, removal, repair, installation, preparation of carpet, vct, ceramic tile, quarry tile, base, and specialty floors as well as the removal and installation of cove base. The intent of this solicitation is to select one or multiple companies to provide flooring services for various Airport properties on an on-call as needed basis.
CLT is seeking proposals from qualified executive search firms to provide recruitment services for Director and C-Suite Level positions. The selected firm will be responsible for identifying, evaluating, and presenting highly qualified candidates who align with our organization’s values, culture, and strategic goals.