Fire Station No. 32 Roof Replacement engineering-property-management

Department of General Services / Construction

Fire Station No. 32 Roof Replacement

Remove and dispose of existing standing seam metal roof system (approximately 7,931 square feet) down to wood deck. Provide new roofing system to comply with Sealed Drawings and Specifications (underlayment, Standing Seam metal roof, associated metal trim and accessories). Remove and dispose of existing Low Slope Roofing System (approximately 2,006 square feet) down to the …

Fire Station No. 19 Roof Replacement engineering-property-management

Department of General Services / Construction

Fire Station No. 19 Roof Replacement

This work includes the provision of labor, material, equipment, supervision, and administration to integrate the work outlined in these specifications into the total building system such that no leakage into the system occurs.  The roof shall be removed to lightweight concrete. The area shall be cleaned and prepared for reinstallation of roofing materials according to …

Fire Station No. 27 Roof Replacement engineering-property-management

Department of General Services / Construction

Fire Station No. 27 Roof Replacement

This work includes the provision of labor, material, equipment, supervision and administration to integrate the work outlined in these specifications into the total building system such that no leakage into the system occurs.

FIRE STATION #18 ROOF REPLACEMENT engineering-property-management

Department of General Services / Construction

FIRE STATION #18 ROOF REPLACEMENT

Remove and dispose of the existing roof system including flashings and sheet metal down to the existing poured gypsum deck. Provide base sheet mechanically attached to roof deck. Provide vapor retarder. Provide roof insulation system. Provide a cold adhesive applied two-ply modified bitumen roof membrane along with flashings and accessories. Replace sheet metal flashings and …

Firestation 33 Roof Replacement engineering-property-management

Department of General Services / Construction

Firestation 33 Roof Replacement

Project consists of roof replacement of Fire Station 33 in Charlotte, NC. This work includes the provision of labor, material, equipment, supervision, an administration. Replace the existing built-up asphalt roof system with the specified two-ply modified bitumen roof system on 2 roof areas totaling approximately 9,700 square feet of roof area.    

Charlotte Fire Station #37 HVAC & Plumbing Equipment Replacement engineering-property-management

Department of General Services / Construction

Charlotte Fire Station #37 HVAC & Plumbing Equipment Replacement

This project includes HVAC and Plumbing equipment replacements for Charlotte Fire Station #37, located at 13828 South Tryon St, Charlotte, NC 28278. The scope of work includes replacing five (5) roof top air conditioning units with gas heating, one (1) roof mounted energy recovery ventilator, two (2) gas fired water heaters, and related updates to …