Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve: mobilization, earthwork, drainage structures, storm drain pipe systems, and channels. Additional work will include: working over, under, near, and around existing private utilities, asphalt paving concrete flatwork, landscaping, and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within the street right-of-way.
Requirements
Last Updated: 09/06/22
Insurance Requirements+
Automobile-For automobile operations liability
Constructions Bonds-For bidding, payment, completion of construction projects
General Liability-For bodily injury or property damage, arising from products, premises, completed work, personal & advertising injury
Workers Compensation-For lost wages and medical expenses of injured workers
Bonding Requirements+
Bid Bond-City required Bond to ensure that vendors do not retract bids from the time they submit a bit until the contract has been executed.
Payment Bond-City required Bond to ensure that subcontractors and/or suppliers are paid for any work performed.
Performance Bond-City required Bond to ensure satisfactory completion of a project by the vendor.
Subcontracting Opportunities+
Subcontracting Opportunities
Excavation; construction, curb and gutter, construction sewer and Storm Drain; Construction, sidewalk and Driveway; Paving/Resurfacing; Concrete; Masonry; Hauling Services; Traffic Control; Tree and Shrub; Erosion; Landscaping
Estimated Total Value+
$1,000,000 -4,999,999
Utilization+
SBE-Small Business Enterprise
MBE-Minority Business Enterprise
Contract Term+
Through Project Completion
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!