aviation-bluet  Aviation / Construction

Ground Power Circuit Upgrades

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon

Posting Number 2021-Q4(Oct-Dec)-AVI-6754

Anticipated Posting Date 2021-10-20

Commodity Code(s): 91082, 91438

Solicitation Link: https://authoring.charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1814

The intent of this project is to add the required circuits needed to add an additional 90KVA ground power unit to the existing loading bridges B9, B12, B13, B16. The new electrical circuits will be run-up to the rotunda at each loading bridge and terminated in a fused disconnect per the BR+A drawings. The contract term will be eight (8) months.

Requirements

Last Updated: 11/10/21
Insurance Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background