charlotte-water-bluet  Charlotte Water / Construction

Upper Little Sugar Creek Replacement Sewer – Phase 2 and Phase 3 from Bilmark Avenue to Canterwood Drive and 911 Georgetown Storm Drainage Improvement Project (SDIP)

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon

Posting Number 08 2021-Q3(Jul-Sep)-CW-6673

Anticipated Posting Date 2021-08-26

Commodity Code(s): 65800, 91219, 91227, 91319, 91339, 91345, 91347, 91395, 96239, 96292, 96884, 98814, 98815, 98852

Solicitation Link: https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1765

The Project consists of the installation of 250 LF of 8” sewer; 3,060 LF of 16” sewer; 3,100 LF of 18” sewer; 37 manholes; bypass pumping of wastewater; and other related sewer installation/replacement work for the Upper Little Sugar Creek Replacement Sewer Phases 2 and 3 portions. For the 911 Georgetown SDIP, the project consists of the Installation of 394 LF of 5’ X 4’ Precast R.C. Box Culvert; 60 LF of 10’ X 8’ Precast R.C. Box Culvert; 9 masonry drainage structures; and other related storm drainage installation work.

Requirements

Last Updated: 09/21/21
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Katherine Osborne

City Contact

katherine.osborne@charlottenc.gov