charlotte-storm-water-services-bluet  Charlotte Storm Water Services / Construction

Chatham Storm Drainage Improvement Project

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2026-04-14 2026-04-14 Chatham Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Posting Number 04 2026-Q2(Apr-Jun)-CSWS-5451

Anticipated Posting Date 2026-04-14

Commodity Code(s): 74505, 91200, 91244, 91345, 91430, 92912, 92915, 96884, 98814

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Requirements

Last Updated: 08/21/24
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background