The Project consists of rehabilitation of approximately 2,700 feet of 78-inch sanitary sewer via cured-in-place pipe lining (CIPP) including all preparatory work such as sewer cleaning nd television inspection, bypass pumping of wastewater flows, and complete restoration.
Requirements
Last Updated: 05/11/21
Insurance Requirements+
Automobile-For automobile operations liability
Constructions Bonds-For bidding, payment, completion of construction projects
General Liability-For bodily injury or property damage, arising from products, premises, completed work, personal & advertising injury
Pollution Legal Liability-For transit of pollutants (on auto liability) or contamination of work site, and off-site
Workers Compensation-For lost wages and medical expenses of injured workers
Bonding Requirements+
Bid Bond-City required Bond to ensure that vendors do not retract bids from the time they submit a bit until the contract has been executed.
Payment Bond-City required Bond to ensure that subcontractors and/or suppliers are paid for any work performed.
Performance Bond-City required Bond to ensure satisfactory completion of a project by the vendor.
Subcontracting Opportunities+
Subcontracting Opportunities
Pumps Miscellaneous (Not Otherwise Classified); Construction Curb and Gutter (Includes Maintenance Repair and Removal); Construction Sidewalk and Driveway (Includes Pedestrian and Handicap Ramps); Paving/Resurfacing Highway and Road, Video Scanning of Sewers Water Wells etc.,; Pavement Marking Services (Including Removal of Markings); Pumps and Pump Accessory Rental or Lease; and Landscaping (Including Design Fertilizing Planting etc. But Not Grounds Maintenance or Tree Trimming Services).
Estimated Total Value+
$5,000,000 - 9,999,999
Utilization+
SBE-Small Business Enterprise
MBE-Minority Business Enterprise
Contract Term+
Through Project Completion
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!