Charlotte Storm Water Services / Construction
N Church St (901) Storm Drainage Improvement Project – CANCELLED
Details
Posting Number 05 2021-Q2(Apr-Jun)-CSWS-3449
Anticipated Posting Date 2021-05-17
Commodity Code(s): 91200
This project will be constructed through a STW unspecified contract eliminating the need for the project to go out for bid.
The purpose and need for the construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.
Requirements
Last Updated: 02/12/21
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!