engineering-property-management-bluet  Department of General Services / Construction

Uptown Cycle Track

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon

Posting Number 10 2020-Q4(Oct-Dec)-DGS-2561

Anticipated Posting Date 2020-10-16

Commodity Code(s): 91327

Solicitation Link: https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1520

The project includes implementation of a two-way separated cycle track in Uptown Charlotte along portion of 5th and 6th street. It will provide a connection between Little Sugar and Irwin Creek Greenways. The cycle track will be constructed mostly within the existing roadway, currently used as vehicular travel lanes and on‐street parking. Traffic signals will be modified and an at‐grade crossing of the Lynx Blue Line is required. Work includes the construction of cycle tracks and ramps, concrete medians, pavement markings, milling, resurfacing, traffic signals and signage.

Requirements

Last Updated: 11/16/20
Insurance Requirements+
Bonding Requirements+
Subcontracting Opportunities+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Sadia Khan

City Contact

skhan@charlottenc.gov