Earlybird, Business Opportunity Pipeline, City of Charlotte

aviation-bluet  Aviation / Architectural / Engineering Services

Early Bag Storage Design

Details

Print Download
Add to Calendar 2026-04-27 2026-04-27 Early Bag Storage Design

Charlotte Douglas International Airport (CLT) anticipates seeking statements of qualifications from professional architecture firms to provide design of an Early Baggage Storage (EBS) facility at Charlotte Douglas International Airport (CLT) to address operational constraints with the existing Baggage Handling System (BHS). The project is intended to improve transfer baggage management, reduce sortation congestion, and enhance overall baggage system resiliency, particularly during irregular operations (IROPs). The proposed EBS facility would use an Individual Carrier System (ICS) tote-based storage system integrated with the existing BHS. The system is anticipated to provide approximately 1,830 storage positions within rack structures, at least two ramp-level baggage makeup carousels with a corresponding circulation service road, and required building and code-compliant systems. The EBS facility is expected to be approximately between 90 to 100 feet tall and may require relocation of existing utilities. It is anticipated that the proposed EBS facility would be a multi-level structure constructed above the existing loading dock.

Posting Number 04 2026-Q2(Apr-Jun)-AVI-20780

Anticipated Posting Date 2026-04-27

Commodity Code(s): 91815, 91819, 91897, 92549

Charlotte Douglas International Airport (CLT) anticipates seeking statements of qualifications from professional architecture firms to provide design of an Early Baggage Storage (EBS) facility at Charlotte Douglas International Airport (CLT) to address operational constraints with the existing Baggage Handling System (BHS). The project is intended to improve transfer baggage management, reduce sortation congestion, and enhance overall baggage system resiliency, particularly during irregular operations (IROPs). The proposed EBS facility would use an Individual Carrier System (ICS) tote-based storage system integrated with the existing BHS. The system is anticipated to provide approximately 1,830 storage positions within rack structures, at least two ramp-level baggage makeup carousels with a corresponding circulation service road, and required building and code-compliant systems. The EBS facility is expected to be approximately between 90 to 100 feet tall and may require relocation of existing utilities. It is anticipated that the proposed EBS facility would be a multi-level structure constructed above the existing loading dock.

Requirements

Last Updated: 03/23/26
Insurance Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Facebook Logo X Logo

For Questions, Contact:

Ryan Lingholm

Procurement Officer

Ryan.Lingholm@ci.charlotte.nc.us