Earlybird, Business Opportunity Pipeline, City of Charlotte

charlotte-storm-water-services-bluet  Charlotte Storm Water Services / Construction

Collective Culverts 1 Storm Drainage Improvement Project

Details

Print Download
Add to Calendar 2028-02-11 2028-02-11 Collective Culverts 1 Storm Drainage Improvement Project

The Collective Culvert SDIP 1 consists of five separate drainage culverts at the following locations: N Kings Drive (between Elizateth Ave & Armory Dr), Harris

Houston Road (between Astoria Dr & Bridgehampton Dr), Allister Drive (between Elwood Dr & Walnut Wood Dr), Parview Drive (near 4701 Parview Dr N), and Pence Road (between Bandy Dr & Pence Pond Ln).  The improvements will include lining or rehabilitating existing culverts and/or replacing existing culverts.

Posting Number 02 2028-Q1(Jan-Mar)-CSWS-20401

Anticipated Posting Date 2028-02-11

Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915

The Collective Culvert SDIP 1 consists of five separate drainage culverts at the following locations: N Kings Drive (between Elizateth Ave & Armory Dr), Harris

Houston Road (between Astoria Dr & Bridgehampton Dr), Allister Drive (between Elwood Dr & Walnut Wood Dr), Parview Drive (near 4701 Parview Dr N), and Pence Road (between Bandy Dr & Pence Pond Ln).  The improvements will include lining or rehabilitating existing culverts and/or replacing existing culverts.

Requirements

Last Updated: 03/05/26
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Facebook Logo X Logo

For Questions, Contact:

Colleen Tully

City Contact

Colleen.Tully@charlottenc.gov