charlotte-storm-water-services-bluet  Charlotte Storm Water Services / Construction

North Hoskins Rd 601 Storm Drainage Improvement Project

Details

Print Download
Add to Calendar 2027-02-15 2027-02-15 North Hoskins Rd 601 Storm Drainage Improvement Project

Asset Management performed an inspection of the dual 72-inch CMP beneath N Hoskins Road in May 2024. Several holes with visible soil were observed during the inspection. Severe road settlement was also noted above the culvert. The City intends to replace 105LF of duel 72” CMP with 105LF of 11’x8” RCBC; add (2) Non-standard headwalls; add 120 LF of 54” RCP; remove 21LF 36” RCP; add (2) DCBs; Add (1) CB; replace approx. 253LF of 12” sewer; replace approx. 120LF 8” Sewer;  replace (4) sewer manholes; Add/replace approx. 382LF 2’6” C&G; asphalt replacement

Posting Number 02 2027-Q1(Jan-Mar)-CSWS-20354

Anticipated Posting Date 2027-02-15

Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915

Asset Management performed an inspection of the dual 72-inch CMP beneath N Hoskins Road in May 2024. Several holes with visible soil were observed during the inspection. Severe road settlement was also noted above the culvert. The City intends to replace 105LF of duel 72” CMP with 105LF of 11’x8” RCBC; add (2) Non-standard headwalls; add 120 LF of 54” RCP; remove 21LF 36” RCP; add (2) DCBs; Add (1) CB; replace approx. 253LF of 12” sewer; replace approx. 120LF 8” Sewer;  replace (4) sewer manholes; Add/replace approx. 382LF 2’6” C&G; asphalt replacement

Requirements

Last Updated: 02/24/26
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Facebook Logo X Logo

For Questions, Contact:

Colleen Tully

City Contact

Colleen.Tully@charlottenc.gov