Charlotte Storm Water Services / Construction
Asset Management performed an inspection of the dual 72-inch CMP beneath N Hoskins Road in May 2024. Several holes with visible soil were observed during the inspection. Severe road settlement was also noted above the culvert. The City intends to replace 105LF of duel 72” CMP with 105LF of 11’x8” RCBC; add (2) Non-standard headwalls; add 120 LF of 54” RCP; remove 21LF 36” RCP; add (2) DCBs; Add (1) CB; replace approx. 253LF of 12” sewer; replace approx. 120LF 8” Sewer; replace (4) sewer manholes; Add/replace approx. 382LF 2’6” C&G; asphalt replacement
Posting Number 02 2027-Q1(Jan-Mar)-CSWS-20354
Anticipated Posting Date 2027-02-15
Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915
Asset Management performed an inspection of the dual 72-inch CMP beneath N Hoskins Road in May 2024. Several holes with visible soil were observed during the inspection. Severe road settlement was also noted above the culvert. The City intends to replace 105LF of duel 72” CMP with 105LF of 11’x8” RCBC; add (2) Non-standard headwalls; add 120 LF of 54” RCP; remove 21LF 36” RCP; add (2) DCBs; Add (1) CB; replace approx. 253LF of 12” sewer; replace approx. 120LF 8” Sewer; replace (4) sewer manholes; Add/replace approx. 382LF 2’6” C&G; asphalt replacement
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!