Charlotte Storm Water Services / Construction
Project initiated due to several holes and corrosion in the existing 16.25’x9.5’ elliptical pipe. Cracks in the headwalls were also observed. The City intends to replace 81LF 16.25’x9.5’ elliptical pipe with 81LF of 14’x9’ RCBC; add (2) Non-standard headwalls; add 213 LF of 24” RCP; replace 56LF of 15” RCP; add (3) CBs; Add (2) JBs; plug and fill approx. 220LF of 18” RCP; Add/replace approx. 600LF 2’6” C&G; channel grading; asphalt replacement.
Posting Number 10 2026-Q4(Oct-Dec)-CSWS-20350
Anticipated Posting Date 2026-10-19
Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915
Project initiated due to several holes and corrosion in the existing 16.25’x9.5’ elliptical pipe. Cracks in the headwalls were also observed. The City intends to replace 81LF 16.25’x9.5’ elliptical pipe with 81LF of 14’x9’ RCBC; add (2) Non-standard headwalls; add 213 LF of 24” RCP; replace 56LF of 15” RCP; add (3) CBs; Add (2) JBs; plug and fill approx. 220LF of 18” RCP; Add/replace approx. 600LF 2’6” C&G; channel grading; asphalt replacement.
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!