Earlybird, Business Opportunity Pipeline, City of Charlotte

aviation-bluet  Aviation / Construction

South Ramp Expansion Bid Package 1

Details

Print Download
Add to Calendar 2026-08-11 2026-08-11 South Ramp Expansion Bid Package 1

Package 1 of the South Ramp Expansion Program for Charlotte Douglas International Airport (CLT or the Airport) is the first phase of construction of the overall program targeted to enhance capacity and improve efficiency of the terminal ramp by addressing ramp congestion, improving taxi times and enhancing safety. The scope of work will include but is not limited to pavement demolition, cement concrete pavement, asphalt shoulder paving, grading, drainage, erosion and sediment control, pavement markings, and airfield electrical installation.

Posting Number 08 2026-Q3(Jul-Sep)-AVI-20166

Anticipated Posting Date 2026-08-11

Commodity Code(s): 90910, 91223, 91240, 96861

Package 1 of the South Ramp Expansion Program for Charlotte Douglas International Airport (CLT or the Airport) is the first phase of construction of the overall program targeted to enhance capacity and improve efficiency of the terminal ramp by addressing ramp congestion, improving taxi times and enhancing safety. The scope of work will include but is not limited to pavement demolition, cement concrete pavement, asphalt shoulder paving, grading, drainage, erosion and sediment control, pavement markings, and airfield electrical installation.

Requirements

Last Updated: 02/16/26
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Facebook Logo X Logo

For Questions, Contact:

Ryan Lingholm

Procurement Officer

Ryan.Lingholm@ci.charlotte.nc.us