Aviation / Construction
This project is a renovation at the airport’s fixed based operator (FBO) location that will modify the existing mechanical infrastructure to bring the system into compliance with NFPA code and safety standards, while also increasing flow capacity to allow for faster fueling operations.
The scope of work includes replacement of the meter and filters, replacement of the control valve with a flow-rate control system, and the addition of an overfill prevention system and relaxation chamber.
The project duration is anticipated to be approximately five months, with roughly four months allocated for shop fabrication, assembly, and submittals, followed by approximately one month for onsite installation.
Posting Number 03 2026-Q1(Jan-Mar)-AVI-19992
Anticipated Posting Date 2026-03-30
Commodity Code(s): 03583, 55736, 90910, 90911, 92843, 92844
This project is a renovation at the airport’s fixed based operator (FBO) location that will modify the existing mechanical infrastructure to bring the system into compliance with NFPA code and safety standards, while also increasing flow capacity to allow for faster fueling operations.
The scope of work includes replacement of the meter and filters, replacement of the control valve with a flow-rate control system, and the addition of an overfill prevention system and relaxation chamber.
The project duration is anticipated to be approximately five months, with roughly four months allocated for shop fabrication, assembly, and submittals, followed by approximately one month for onsite installation.